EDF - Flamanville NPP

  • Flamanville Nuclear Power Plant

  •  ID file of the NPP

    • Commissioning date: 1985 for Production Unit n°1 / 1986 for Production Unit n°2
    • 2015 Production: 16,9 TWh
    • Number of Production Units: 2
    • Total power: 2 x 1300 MW

    ISO14001 certified since 2003, the Flamanville 1&2 power plant commits to concrete reduction initiatives of its impact on the environment. Thus, the water consumption (25 146 m3 in 2013) has been reduced by nearly 70% since 10 years.
    In 2013, more than 92% of the industrial wastes has been recycled and retransformed.  The discharges and effluents of the industrial plant are always controlled and systematically inferior to the regulatory limits.

    The safety is all the measures implemented by the operator of a nuclear plant in order to protect the human and the environment against the radioactive products dispersion.

    With the risks prevention, this is the first priority of the Flamanville EDF teams. The operators’ professionalism of the Flamanville power plant, the improvement systematic research, the good condition of the equipment ensures a good level of safety.

    In 2015, the French nuclear fleet produced 416,8 billion of KWh. Flamanville Nuclear Power Plant, however, produced 16,9 TWh, which represents about 4,5% of the total EDF French nuclear power production.

  • Programme

  • FRIDAY, JULY 1st 2016

    07.07 AM - Departure from Paris Saint Lazare train station

    09.50 AM - Arrival to Valognes train station - Transfer to Flamanville by minibus

    10.45 AM - Arrival to EDF Flamanville – Public Information Centre
    Access procedures
    Welcome by Stéphane Brasseur, Unit Manager of Flamanville 1,2 or a managing director
    Welcome coffee

    11.00 AM - Presentations
    · Flamanville 1,2 Nuclear Power Plant identity card
    · Movies

    11.45 AM - Cocktail lunch by a caterer at the Public Information Centre

    12.45 PM - Safety Equipments

    01.00 PM - Visit of the site
    - 01.15 PM: Visit of the fuel building (nuclear area)
    - 02.45 PM: Visit of the turbine hall
    - 03.45 PM: Visit of the control room simulator (exact replica of the main control room)

    04.15 PM - Return to the Public Information Centre

    04.30 PM - Departure from the site by minibus - Transfer to Cherbourg

    05.35 PM - Train to Cherbourg

    08.46 PM
    - Arrival to Paris Saint-Lazare